NEWS

Inquiry no. 9/POIR/SBB 9002/2017

With reference to the planned implementation of the project entitled: Hybrid integrated adsorption system to reduce mercury emissions with the use of high-efficiency polymer components in the company SBB Energy S.A., which will be implemented within the Smart Growth Operational Programme 2014-2020 Measure 1.2, we would like to present an inquiry no. 9/POIR/SBB 9002/2017 on delivery of test cartridges and collectors for the construction of a pilot plant.

9-POIR-SBB-9002-2017-EN.pdf
App-no-1-to-9-POIR-SBB-9002-2017-EN.docx
App-no-2-to-9-POIR-SBB-9002-2017-EN.pdf


2017-07-21

The end of the 3rd Technology Forum: IED, BREF, BAT, BEP, industrial emissions, available technologies, organized by POWERMEETINGS.EU

The end of the 3rd Technology Forum: IED, BREF, BAT, BEP, industrial emissions, available technologies, organized by POWERMEETINGS.EU, whose content partner was SBB ENERGY S.A. Managing Director of POWERMEETINGS.EU and the organizer of the Forum - Renata Kałużna inaugurated the event.


2017-05-19

The 3rd edition of Technology Forum

The 3rd edition of Technology Forum: IED, BREF, BAT, BEP, industrial emissions, available technologies” is in progress. Conference is  organized by POWERMEETINGS where traditionally SBB ENERGY S.A. appeared as a contents partner. Experts are debating just about the new BAT conclusions for the power industry.


2017-05-18

LATEST PROJECTS

  • Principal:
    EDF Polska S.A. Elektrociepłownia Gdynia
    Customer:
    EDF Polska S.A. CHP Gdynia
    Scope of work:

    Execution of installation works in the construction of primary and SNCR methods plant on two boilers BC-50 in CHP Plant in Gdynia as General Constructor.

  • Principal:
    Veolia Energia Poznań - Zespół Elektrociepłowni S.A.
    Customer:
    CHP Poznań
    Scope of work:

    Execution of installation works in the construction of DeNOx by SNCR method on boilers 1K2, 2K, 3K in CHP Plant Karolin in Poznań.

  • Principal:
    ELEMONT SP. Z O.O
    Customer:
    PGE GiEK S.A. Oddział Elektrownia Opole
    Scope of work:

    Installation and lightening in buildings 5UHA and 6UHA in the construction of power units in Opole Power Plant..

  • Principal:
    KRALOPOLSKA RIA - Elektrownia Chvaletice w Czechach
    Customer:
    CHP Chvaletice, Czech Republic
    Scope of work:

    DeNOx installation for two boilres K3 and K4.

  • Principal:
    Veolia Energia Poznań - Zespół Elektrociepłowni
    Customer:
    CHP Poznań
    Scope of work:

    DeNOx system installation for all three units.

  • Principal:
    EDF Polska S.A. Elektrociepłownia Gdynia
    Customer:
    CHP Gdynia
    Scope of work:

    Adaptation of boilres to meet the requirements for NOx emmisions using primary and secondary SNCR methods.

  • Principal:
    Elektrociepłowania Będzin Sp. z o.o.
    Customer:
    CHP Będzin
    Scope of work:

    Execution of installation works in the construction of DeSOx and DeNOx in CHP Plant in Będzin for boilres no. 7, no.6, no.5 as General Contractor.

  • Principal:
    Andritz Energy&Environment GmbH
    Customer:
    Mjölby / Sweden
    Scope of work:

    Commissioning works on biomas unit in Mjölby, Sweden

  • Principal:
    E.ON ENERGY
    Customer:
    Marl / Germany
    Scope of work:

    Start ups in Chemical Industrial Plant

  • Principal:
    ALSTOM s.r.o.
    Customer:
    Ledvice/Czech Republic
    Scope of work:

    Commissioning works on unit 660 MW in Ledvice,  Czech Republic

REFERENCES: